---
title: "Construction project management software with Claude · Projectify"
description: "Construction project management software for jobs, RFIs, submittals and punch lists, with Claude turning site walk notes into items for each trade."
url: https://projectify.si/for/construction
---

# Construction project management software from mobilization to closeout.

> Each job gets a board for its RFIs, submittals, trades and punch list. Supers walk the site, paste their notes, and Claude sorts them into punch items by area and trade, ready for the morning huddle.

Start free: https://app.projectify.si/signup. A month of Premium free, no card. Agents never take a seat.

## Where a job loses the thread.

- "The punch list is on a clipboard, a phone and an email, and none of them match." It is one list on the job, by area and trade. The web app works on a phone, so the super ticks items off during the walk.
- "RFIs sit with the design team and the trades blame us for the wait." Every RFI shows its days open and what it holds up. Claude drafts the follow-up with the question and the drawing reference for the PM to send.
- "Closeout drags on for months because nobody knows which warranties we’re still missing." Closeout is a checklist of O&M manuals, warranties and as-builts per trade. Claude reads each document as it is added and ticks what it covers.

## A project engineer’s help on every job.

- **Turns the site walk into punch items.** Paste or dictate your walk notes into the job’s channel. Claude makes a punch item for each, with the area, the trade and the words it came from. For example: Level 1 east: 22 items, 9 for drywall, 6 for paint.
- **Closes out every job the same way.** Show Projectify how your company closes a job once. It becomes a workflow with checks where the super and the owner walk the space. For example: Elm Ridge closeout: 5 of 7 steps done, the owner walk waits for you.
- **Keeps the daily site checks.** Safety walks, housekeeping and end-of-day checks are routines ticked by day, so a skipped day shows before anyone asks. For example: Site safety walk ticked Monday to Thursday.
- **Gives every trade its own view.** Filter the job by trade and each sub’s foreman sees only their punch items, RFIs and submittals, in the order they are due. For example: Electrical: 12 punch items, 2 submittals out.

## The board it starts with

- Statuses: Open, In progress, Ready for check, Super check, Back to trade, Closed
- Fields: Area, Trade, Spec section, Days open, Due, Assigned to
- Views: Board, Table, Checklist, Map, Calendar
- A workflow, Project closeout: Final punch walk → Assign items by trade → Trades fix and add a photo → Super verifies each area (a person checks) → Collect O&M manuals and warranties → Owner walkthrough and acceptance (a person checks) → Hand over the closeout binder

## Straight answers for the field.

### Does it work as a construction punch list app on site?

The web app works on a phone, so a super can open the punch list, add photos and tick items on the walk. There is no native app to install.

### Does it do estimating, crew schedules or job costing?

No. Projectify runs the documents and tasks of a job: RFIs, submittals, punch and closeout. Keep estimating, crew scheduling and accounting in the tools you use now.

### Can my PM trust what Claude writes?

Claude drafts the logs and follow-ups; your PM or super reads them before anything goes out. Every change it makes is signed and can be undone.

### Do our subcontractors need accounts?

Anyone working on the board needs a seat in your workspace, as there are no guest logins. You can share a file or folder, like a trade’s punch list, with people outside it.

Related: [Architects](https://projectify.si/for/architects.md), [Engineering firms](https://projectify.si/for/engineering.md), [Real estate](https://projectify.si/for/real-estate.md), [Manufacturing](https://projectify.si/for/manufacturing.md). Every kind of work: [For your work](https://projectify.si/for.md).