For your workManufacturing

Manufacturing project management software for launches, tooling and ECOs.

Take a part from drawing release to production on one board. Tooling, first article inspection, PPAP documents and engineering change orders each get a card, and Claude keeps the gates in view so nothing reaches the line unchecked.

A month of Premium free, no cardAgents never take a seat

Sound familiar?

Where a launch loses its weeks.

An ECO goes out and half the floor is still running the last revision.

With ProjectifyEach ECO is a task with the parts, documents and stations it touches as a checklist. It stays open until every work instruction is updated and someone signs it.

Launch status lives in my head and a workbook with forty tabs.

With ProjectifyA Gantt view of tooling, trials, PPAP and ramp, each line with an owner. Claude writes the weekly launch review from it.

Supplier paperwork comes in by email and I learn what’s missing at the audit.

With ProjectifyAdd supplier certs and PPAP packages to Files and they are read on arrival. Claude lists which elements each supplier still owes.
What Claude does for manufacturing

A launch coordinator on every new part.

Runs every ECO the same way

Show Projectify how your plant handles an engineering change once. It becomes a workflow with checks where engineering and quality sign.

ECO 117: 4 of 6 steps done, quality sign-off waits for you.

Reads drawings, specs and certs

Drawings, material certs, customer specs and PPAP packages are read as they arrive, so anyone can ask what a revision calls for.

B-220 rev C: 6061-T6, anodize type II, class 2.

Keeps the daily line checks

Startup checks and layered audits are routines ticked by day. Missed days show at a glance, and the web app works on a tablet at the station.

Station 3 startup check: ticked today by Luis.

Puts the launch on one timeline

Tooling, trials, first article, PPAP and ramp sit on one Gantt, each with a date and an owner, so a slip shows its knock-on.

Tooling final wk 19, PPAP due wk 22.
Your board, shaped for manufacturing

Start from a sentence. Keep what fits.

Say what the project is for and Claude drafts it: the statuses, fields and views below, ready to rename, switch off or add to.

Statuses

Not startedIn workTrialQuality reviewReleasedOn hold

Fields

Part numberRevisionStationSupplierDueOwner

Views

GanttBoardTableChecklistTracker
  1. Log the change request
  2. List affected parts and documents
  3. Engineering approves the change (a person checks)
  4. Update drawings and work instructions
  5. Draft notes for stations and suppliers
  6. Quality verifies on the floor (a person checks)
  7. Close the ECO

Engineering change order, as a workflow. The clay steps stop for a person. How workflows work

Questions

What plant teams ask before trying it.

Does this replace our ERP or MES?

No. Projectify runs the projects around production: launches, tooling, changes and quality work. Orders, inventory and the line itself stay in the systems you have.

Should AI be anywhere near our quality records?

Claude drafts and checks; a quality engineer signs. Every change it makes is signed with the person who ran it and can be undone.

Can we keep a PPAP checklist per part?

Yes. Make the elements a checklist on the part’s card, and Claude ticks what it finds in the files for a person to confirm.

Does the floor need laptops?

The web app works on a phone or tablet, so line checks can be ticked where the work is. There is no native mobile app.

Put Claude on your next launch.

A month of Premium free, no card. Set up your next part’s launch board today.